After the discrete model of MLI has been built, the dynamic programming was applied to develop the suboptimum algorithm to achieve the optimum aim.
讨论法中
参数选择对误差
影响,对
法复杂度
分析表明其与优化问题
规
增长是一阶关系。
After the discrete model of MLI has been built, the dynamic programming was applied to develop the suboptimum algorithm to achieve the optimum aim.
讨论法中
参数选择对误差
影响,对
法复杂度
分析表明其与优化问题
规
增长是一阶关系。
The constructed solving process is to establish a general SBR model firstly, then to derive the suboptimum solution by trial and error method with the help of simulation tools.
所构造解法是首先建立通用
序批式反应器
;
后借助仿真工具试差求取次优解。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。