Don't worry about the heavy load, it's chained down.
别担心装量大, 它已经用链子拴住了。
Don't worry about the heavy load, it's chained down.
别担心装量大, 它已经用链子拴住了。
The load is tipped out at the dumping site.
装西被倾倒在垃圾场上。
The boat is freighted with coal.
这条船装煤。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波测距方式间接测量汽车装量
电路方案。
This freighter can carry a 50000-ton cargo direct to any port along the coast of the Pacific.
这艘货轮能够装五万吨货物直接航行到太平洋沿岸
任何一个港口。
The French navy has built an abyssal bathyscaphe to take three men to the floor of the Marianas Trench.
法国海军已经建造了一个深海潜水器,用装
三个人去到马利亚纳海沟
基底。
This ship embarked cargoes.
这艘船装货物。
Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
重点开发生产全断面掘进机、大型液压挖掘机、大吨位轮式装机、系列汽车起重机以及静液压式中小吨位和多功能装
机。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应在船只期二天前,将船名、
日期、装
量、合同号码、船舶代理人电报通知我们。
If the class was loaded by the bootstrap class loader the set of packages loaded from CLASSPATH is searched to find the package of the class.
如果该类被引导类加器装
,从CLASSPATH 中查找该类
包。
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
戈登已经表明,骨骼肌机械装外交事务委员会活化诱导信号,如在FAK
或桩蛋白磷酸化状态
变化决定
。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应在船只期12天前将船名、
日期、装
数量、合同号码、船舶代理人,以电报通知卖方。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。
Don't worry about the heavy load, it's chained down.
别担心量大, 它已经用链子拴住了。
The load is tipped out at the dumping site.
的东西被倾倒在垃圾场上。
The boat is freighted with coal.
这条船煤。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波测距式间接测量汽车
量的电路
。
This freighter can carry a 50000-ton cargo direct to any port along the coast of the Pacific.
这艘货轮能够五万吨货物直接航行到太平洋沿岸的任何一个港口。
The French navy has built an abyssal bathyscaphe to take three men to the floor of the Marianas Trench.
法国海军已经建造了一个深海潜水器,用三个人去到马利亚纳海沟的基底。
This ship embarked cargoes.
这艘船货物。
Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
重点开发生产全断面掘进、大型液压挖掘
、大吨位轮式
、系列汽车起重
以及静液压式中小吨位和多功能
。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应在船只受期二天前,将船名、预计受
日期、
量、合同号码、船舶代理人电报通知我们。
If the class was loaded by the bootstrap class loader the set of packages loaded from CLASSPATH is searched to find the package of the class.
如果该类被引导类加器
,从CLASSPATH 中查找该类的包。
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
戈登已经表明,骨骼肌械
外交事务委员会活化诱导信号,如在FAK的或桩蛋白磷酸化状态的变化决定的。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买应在船只受
期12天前将船名、预计受
日期、
数量、合同号码、船舶代理人,以电报通知卖
。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
Don't worry about the heavy load, it's chained down.
别担心装载量大, 它已经用链子拴住了。
The load is tipped out at the dumping site.
装载的东西被倾倒在垃圾场上。
The boat is freighted with coal.
条船装载煤。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波测距方间接测量汽车装载量的电路方案。
This freighter can carry a 50000-ton cargo direct to any port along the coast of the Pacific.
能够装载五万吨
物直接航行到太平洋沿岸的任何一个港口。
The French navy has built an abyssal bathyscaphe to take three men to the floor of the Marianas Trench.
法国海军已经建造了一个深海潜水器,用装载三个人去到马利亚纳海沟的基底。
This ship embarked cargoes.
船装载
物。
Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
重点开发生产全断面掘进机、大型液压挖掘机、大吨装载机、系列汽车起重机以及静液压
中小吨
和多功能装载机。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应在船只受载期二天前,将船名、预计受载日期、装载量、合同号码、船舶代理人电报通知我们。
If the class was loaded by the bootstrap class loader the set of packages loaded from CLASSPATH is searched to find the package of the class.
如果该类被引导类加载器装载,从CLASSPATH 中查找该类的包。
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
戈登已经表明,骨骼肌机械装载外交事务委员会活化诱导信号,如在FAK的或桩蛋白磷酸化状态的变化决定的。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应在船只受载期12天前将船名、预计受载日期、装载数量、合同号码、船舶代理人,以电报通知卖方。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
Don't worry about the heavy load, it's chained down.
别担心装载量, 它已经用链子拴住了。
The load is tipped out at the dumping site.
装载的东西被倾倒在垃圾场上。
The boat is freighted with coal.
这条船装载煤。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波测距方式间接测量汽车装载量的电路方案。
This freighter can carry a 50000-ton cargo direct to any port along the coast of the Pacific.
这艘轮能够装载五万吨
接航行到太平洋沿岸的任何一个港口。
The French navy has built an abyssal bathyscaphe to take three men to the floor of the Marianas Trench.
法国海军已经建造了一个深海潜水器,用装载三个人去到马利亚纳海沟的基底。
This ship embarked cargoes.
这艘船装载。
Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
重点开发生产全断面掘、
型液压挖掘
、
吨位轮式装载
、系列汽车起重
以及静液压式中小吨位和多功能装载
。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应在船只受载期二天前,将船名、预计受载日期、装载量、合同号码、船舶代理人电报通知我们。
If the class was loaded by the bootstrap class loader the set of packages loaded from CLASSPATH is searched to find the package of the class.
如果该类被引导类加载器装载,从CLASSPATH 中查找该类的包。
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
戈登已经表明,骨骼肌械装载外交事务委员会活化诱导信号,如在FAK的或桩蛋白磷酸化状态的变化决定的。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应在船只受载期12天前将船名、预计受载日期、装载数量、合同号码、船舶代理人,以电报通知卖方。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
Don't worry about the heavy load, it's chained down.
别担心装载量大, 它已经用链子拴住了。
The load is tipped out at the dumping site.
装载的东西被倾倒在垃圾场上。
The boat is freighted with coal.
这条船装载煤。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波间接
量汽车装载量的电路
案。
This freighter can carry a 50000-ton cargo direct to any port along the coast of the Pacific.
这艘货轮能够装载五万吨货物直接航行到太平洋沿岸的任何一个港口。
The French navy has built an abyssal bathyscaphe to take three men to the floor of the Marianas Trench.
法国海军已经建造了一个深海潜水器,用装载三个人去到马利亚纳海沟的基底。
This ship embarked cargoes.
这艘船装载货物。
Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
重点开发生产全断面掘进机、大型液压挖掘机、大吨位轮装载机、系列汽车起重机以及静液压
吨位和多功能装载机。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应在船只受载期二天前,将船名、预计受载日期、装载量、合同号码、船舶代理人电报通知我们。
If the class was loaded by the bootstrap class loader the set of packages loaded from CLASSPATH is searched to find the package of the class.
如果该类被引导类加载器装载,从CLASSPATH 查找该类的包。
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
戈登已经表明,骨骼肌机械装载外交事务委员会活化诱导信号,如在FAK的或桩蛋白磷酸化状态的变化决定的。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买应在船只受载期12天前将船名、预计受载日期、装载数量、合同号码、船舶代理人,以电报通知卖
。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
Don't worry about the heavy load, it's chained down.
别担心装量大, 它已经用链子拴住了。
The load is tipped out at the dumping site.
装的东西被倾倒在垃圾场上。
The boat is freighted with coal.
这条船装。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
一种利用超声波测距方式间接测量汽车装
量的电路方案。
This freighter can carry a 50000-ton cargo direct to any port along the coast of the Pacific.
这艘货轮能够装五万吨货物直接航行到太平洋沿岸的任何一个港口。
The French navy has built an abyssal bathyscaphe to take three men to the floor of the Marianas Trench.
法国海军已经建造了一个深海潜水器,用装
三个人去到马利亚纳海沟的基底。
This ship embarked cargoes.
这艘船装货物。
Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
重点开发生产全断面掘进、大型液压挖掘
、大吨位轮式装
、系列汽车起重
以及静液压式中小吨位和多功能装
。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、们应在船只受
期二天前,将船名、预计受
日期、装
量、合同号码、船舶代理人电报通知我们。
If the class was loaded by the bootstrap class loader the set of packages loaded from CLASSPATH is searched to find the package of the class.
如果该类被引导类加器装
,从CLASSPATH 中查找该类的包。
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
戈登已经表明,骨骼肌械装
外交事务委员会活化诱导信号,如在FAK的或桩蛋白磷酸化状态的变化决定的。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应在船只受期12天前将船名、预计受
日期、装
数量、合同号码、船舶代理人,以电报通知卖方。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
Don't worry about the heavy load, it's chained down.
别担心装载量大, 它已经用链子拴住了。
The load is tipped out at the dumping site.
装载的东西被倾倒在垃圾场上。
The boat is freighted with coal.
这条船装载煤。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波测距方式间接测量汽车装载量的电路方案。
This freighter can carry a 50000-ton cargo direct to any port along the coast of the Pacific.
这能够装载五万
物直接航行到太平洋沿岸的任何一个港口。
The French navy has built an abyssal bathyscaphe to take three men to the floor of the Marianas Trench.
法国海军已经建造了一个深海潜水器,用装载三个人去到马利亚纳海沟的基底。
This ship embarked cargoes.
这船装载
物。
Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
重点开发生产全断面掘进机、大型液压挖掘机、大式装载机、系列汽车起重机以及静液压式中小
和多功能装载机。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应在船只受载期二天前,将船名、预计受载日期、装载量、合同号码、船舶代理人电报通知我们。
If the class was loaded by the bootstrap class loader the set of packages loaded from CLASSPATH is searched to find the package of the class.
如果该类被引导类加载器装载,从CLASSPATH 中查找该类的包。
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
戈登已经表明,骨骼肌机械装载外交事务委员会活化诱导信号,如在FAK的或桩蛋白磷酸化状态的变化决定的。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应在船只受载期12天前将船名、预计受载日期、装载数量、合同号码、船舶代理人,以电报通知卖方。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
Don't worry about the heavy load, it's chained down.
别担心装载量大, 它已经用链子拴住了。
The load is tipped out at the dumping site.
装载的东西被倾倒垃圾场上。
The boat is freighted with coal.
装载煤。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波测距方式间接测量汽车装载量的电路方案。
This freighter can carry a 50000-ton cargo direct to any port along the coast of the Pacific.
艘货轮能够装载五万吨货物直接航行到太平洋沿岸的任何一个港口。
The French navy has built an abyssal bathyscaphe to take three men to the floor of the Marianas Trench.
法国海军已经建造了一个深海潜水器,用装载三个人去到马利亚纳海沟的基底。
This ship embarked cargoes.
艘
装载货物。
Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
重点开发生产全断面掘进机、大型液压挖掘机、大吨位轮式装载机、系列汽车起重机以及静液压式中小吨位和多功能装载机。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应受载期二天前,将
名、预计受载日期、装载量、合同号码、
舶代理人电报通知我们。
If the class was loaded by the bootstrap class loader the set of packages loaded from CLASSPATH is searched to find the package of the class.
如果该类被引导类加载器装载,从CLASSPATH 中查找该类的包。
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
戈登已经表明,骨骼肌机械装载外交事务委员会活化诱导信号,如FAK的或桩蛋白磷酸化状态的变化决定的。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应受载期12天前将
名、预计受载日期、装载数量、合同号码、
舶代理人,以电报通知卖方。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
Don't worry about the heavy load, it's chained down.
别担心装载量大, 它已经用链子拴住了。
The load is tipped out at the dumping site.
装载的东西倾倒在垃圾场上。
The boat is freighted with coal.
这条船装载煤。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波测距方式间接测量汽车装载量的电路方案。
This freighter can carry a 50000-ton cargo direct to any port along the coast of the Pacific.
这艘货轮能够装载五万吨货物直接航行到太平洋沿岸的任何一个港口。
The French navy has built an abyssal bathyscaphe to take three men to the floor of the Marianas Trench.
法国海军已经建造了一个深海潜水器,用装载三个人去到马利亚纳海沟的基底。
This ship embarked cargoes.
这艘船装载货物。
Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
重点开发生产全断面掘进机、大型液压挖掘机、大吨位轮式装载机、系列汽车起重机以及静液压式中小吨位和多功能装载机。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应在船只受载期二天前,将船名、预计受载日期、装载量、合同号码、船舶代理人电报通知我们。
If the class was loaded by the bootstrap class loader the set of packages loaded from CLASSPATH is searched to find the package of the class.
如果该类类加载器装载,从CLASSPATH 中查找该类的包。
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
戈登已经表明,骨骼肌机械装载外交事务委员会活化诱信号,如在FAK的或桩蛋白磷酸化状态的变化决定的。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应在船只受载期12天前将船名、预计受载日期、装载数量、合同号码、船舶代理人,以电报通知卖方。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。