BDMP(Bridge Design Method and Process) was created in 2007.We mainly concentrate in the research of Life-Cycle Design, Risk Evaluation, Wind-resistance Analysis and Bridge Aesthesis Design.
The prestressed concrete continuous rigid frame bridge is widely used because of its high strength, lightful line type, convenient and fast construction, long-span ability.
The mission of this article is to simplely design the bridge automation monitorial and control system inorder to establish a basis for the future design.
For lack of the theoretical calculation method at present,the skew bridge backwater is simulated in adopting circle pier and embank uncompressing river through hydraulic models.
Superpopulation model is a bridge between survey sampling and other branches of statistics.It is helpful to study sampling theory with the tool of superpopulation models.