The unit is composed of hydraulic and double conic placing,hydraulic spading and drawing ,straightening,shearing,end stopping,coiling,feeding,dropping cart,ect.
To avoid the diseconomy caused by frequently starting and stopping of the generators, a rule of “capacity limit” is adopted to coordinate the bidding behaviors.
Online Flattener is main equipment of welded pipe unit,the property of Flattener is very important to ensure production of welded pipe with larger wall thickness going well.
Through the research on petroleum and nature gas, design a multi-source heatpump of single and double effect lithium bromide, the two stage heatpump unit, process of nature gas liquefaction etc.
Until was ratified by JiangSu province's control center, project company may not retreat from and may not invest to auxiliary equipment and automechanism which will influence power of generator group.
According to some pilots, members of crews have even been known to play DVDs on laptops in the cockpit to pass the time on particularly long overwater and international flights.