Introduce An Shun's Power plant a Term clotted water depurate equipment's drainage technic change.Change before or anon contrast, sopite design technic existed problem.
According to the report, the company's dam burst due to excess of water in the reservoir lack of monitoring faulty equipment and a failure in the draining system.