To avoid the diseconomy caused by frequently starting and stopping of the generators, a rule of “capacity limit” is adopted to coordinate the bidding behaviors.
The power variation on the consumer side and the generation side caused by double auction may result in power flow's redispatch and have disadvantageous effect on power system security operation.