有奖纠错
| 划词

In addition, the electrical resistivity models of interlocal swelling soil, cement-soil and marine soft soil are proposed.

随后对东南大学岩土工程研究所自行研制土工电阻率测系统作简单介绍。

评价该例句:好评差评指正

The method simplifies the procedure of the trial function choice, and could be used in numerical calculation in geotechnique engineering.

该方法简化,适用于岩土工程各种值计算。

评价该例句:好评差评指正

It's a mean of geotechnical investigation, including borehole surveying, costeaning, trenching exploration, test pitting, hole exploration, geophysical exploration and penetration sounding.

岩土工程勘察一种手段,包括钻探、井探、槽探、坑探、洞探以及物探、触探等。

评价该例句:好评差评指正

Hydraulic Roofbolter is the key equipment for Ground Anchorage Engineering, and has very important affection to the quality of the engineering.

液压锚杆钻机是岩土锚固工程关键设备,对工程质量有重要影响。

评价该例句:好评差评指正

用户正在搜索


fur, furacilin, furacilinum, furacillin, furacin, furacrolein, furadantin, fural, furaldehyde, furaltadone,

相似单词


3G, 401(K), a,

声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。

工程

Soils are kind of weird but don't  tell that to geotechnical engineers.

土壤有点奇怪,但不要告诉岩土工程师。

评价该例句:好评差评指正
工程

The story of the Millennium Tower is a fascinating case study in geotechnical engineering.

千年塔的故事是岩土工程领域一个引人入胜的案例研究。

评价该例句:好评差评指正
工程

All these factors added up to a lot more settlement than was initially anticipated by the project's geotechnical engineers.

所有这些因素加起来导致的沉量比该项目岩土工程师最初预期的要多得多。

评价该例句:好评差评指正
surcharge load

The finite element method and the finite difference method are the two main numerical methods to analyze the geotechnical engineering problems.

有限元法和有限差分法是分析岩土工程问题的两种主要数法。

评价该例句:好评差评指正
工程

Edenville Dam was built in the 1920s before most  of our current understanding of geotechnical engineering and modern dam safety standards  existed.

伊登维尔大坝建于 20 年代,当时我们对岩土工程和现代大坝安全标准的大部分了解还没有出现。

评价该例句:好评差评指正
surcharge load

However, the finite difference method seems to be more effective in the solution of the large deformation problems of geotechnical engineering, which is also the reason for choosing the finite difference method in this study.

然而,有限差分法在解决岩土工程的大变形问题面似乎更有效,这也是本研究选择有限差分法的原因。

评价该例句:好评差评指正
工程

When the building was designed, the project geotechnical engineers predicted that it would settle 4 to 6 inches (10 to 15 centimeters) over the structure's entire lifetime, mainly from this layer of Old Bay Clay below the bottom of the piles.

在设计该建筑时, 项目岩土工程师预测, 在该建筑的整个使用寿命期间, 它会沉 4 至 6 英寸(10 至 15 厘米),主要来自桩底部下的这层老湾粘土。

评价该例句:好评差评指正

用户正在搜索


furanodienone, furanoeremophilone, furanoid, furanomycin, furanophane, furanose, furanoside, furantoin, furaprofen, furapromide,

相似单词


3G, 401(K), a,
  • 微信二维码

    关注我们的微信

  • 手机客户端二维码

    下载手机客户端

赞助商链接