Its tunnels were built using a method known as cut-and-cover, where rather than boring a tunnel through the ground, instead, a massive trench is dug, the railway built, and then the trench roofed over again.
地铁隧道是
明挖覆盖式工法兴建,不直接挖穿地面,而是挖掘坑道、兴建铁路轨道,再将地面回填。