While conducting hydraulic fracturing, the flow rate is required to be controlled to enable the hall-off to block off and uncord the eyelet based on the stimulation process.
封堵球分层压时,为了使暂堵球按照施工泵注程序对射
行封堵和解封,需要对压
施工的泵注排量提出要
。
While conducting hydraulic fracturing, the flow rate is required to be controlled to enable the hall-off to block off and uncord the eyelet based on the stimulation process.
封堵球分层压时,为了使暂堵球按照施工泵注程序对射
行封堵和解封,需要对压
施工的泵注排量提出要
。
:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。