While conducting hydraulic fracturing, the flow rate is required to be controlled to enable the hall-off to block off and uncord the eyelet based on the stimulation process.
封堵球分层压时,为了使暂堵球按照施
注程序
射孔孔眼进行封堵和解封,
压
施
注排量提出
求。
While conducting hydraulic fracturing, the flow rate is required to be controlled to enable the hall-off to block off and uncord the eyelet based on the stimulation process.
封堵球分层压时,为了使暂堵球按照施
注程序
射孔孔眼进行封堵和解封,
压
施
注排量提出
求。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人审核,其表达内容亦不代表本软件
观点;若发现问题,欢迎向我们指正。